The bermuda rebuild is coming right along. Bought loads of stuff at the Miami Boat show -NextGen gen, 1200 btu Webasto AC (should have asked you guys first), Xantrex 2500 inverter/charger and even a new toilet.
I've imported all the Imron paint and primer, soundown and nicer engine mounts are on the way as are some tacky Ocean underwater lights to cap it all off. The Glasstech cockpit and platform are also on the way.
Gonna spray her Oyster white with black stripe and bottom (with Imron!)
Will be needing a new windscreen rubber and other parts though.
I would like to get little steps that fit on the rear cabin struts, and some of the chrome plated bronze 60 degree stanchion bases and Tee's to re chrome. I don't like the stainless versions available. Also still needing the original tank fittings as the ones to mine have been lost in time and space.
Hope somebody out there can help out with these items as trying to get her ready for the water at least for April!
Got a good guy working on her who shows up on time and actually thinks when he runs into a problem. All of the cockpit floor substructure is made from beams of 3/4 inch Divinycell and laid up with biaxial and epoxy -no rot here ever.
Time is getting short now for the big splash. Will send pics at some point.
Sincerely,
JJ
The bermuda rebuild is coming right along. Bought loads of stuff at the Miami Boat show -NextGen gen, 1200 btu Webasto AC (should have asked you guys first), Xantrex 2500 inverter/charger and even a new toilet.
I've imported all the Imron paint and primer, soundown and nicer engine mounts are on the way as are some tacky Ocean underwater lights to cap it all off. The Glasstech cockpit and platform are also on the way.
Gonna spray her Oyster white with black stripe and bottom (with Imron!)
Will be needing a new windscreen rubber and other parts though.
I would like to get little steps that fit on the rear cabin struts, and some of the chrome plated bronze 60 degree stanchion bases and Tee's to re chrome. I don't like the stainless versions available. Also still needing the original tank fittings as the ones to mine have been lost in time and space.
Hope somebody out there can help out with these items as trying to get her ready for the water at least for April!
Got a good guy working on her who shows up on time and actually thinks when he runs into a problem. All of the cockpit floor substructure is made from beams of 3/4 inch Divinycell and laid up with biaxial and epoxy -no rot here ever.
Time is getting short now for the big splash. Will send pics at some point.