Two items for your purusal and advice.
Spoke with Alex Whittaker about my rub rialproblem and if you're considering a new one give him a call.
Second, once the original rub rail is removed and boat prepped, how many hours should it take to install a new PVC rub rail?
Thanks
Rub rails
Moderators: CaptPatrick, mike ohlstein, Bruce
Install is pretty straight forward. Layout is a couple of hours, figuring the miter cuts is pretty intense and depending how good you are could take a few hours as well.
With the right clamps, hardware, caulk and layout complete its 2 guys a little over 8 hours. +/- for joint work.
Then the stainless (this is where you figure out how good your layout was).
I thought the number was around 5.5k to have a yard do it and that was including the materials.
With the right clamps, hardware, caulk and layout complete its 2 guys a little over 8 hours. +/- for joint work.
Then the stainless (this is where you figure out how good your layout was).
I thought the number was around 5.5k to have a yard do it and that was including the materials.
KR
JP
1977 RLDT "CHIMERA"
JP
1977 RLDT "CHIMERA"
- JohnCranston
- Senior Member
- Posts: 737
- Joined: Jul 8th, '06, 17:50
- Location: Spring, TX; Freeport TX
- mike ohlstein
- Site Admin
- Posts: 2394
- Joined: Jun 29th, '06, 11:39
- Location: So many things seem like no-brainers until you run into someone with no brain.
- Contact:
Who is online
Users browsing this forum: Bing [Bot] and 63 guests