sorry i have not pics...
So far i have removed the ethanol degraded fuel tank, replaced the rotted center of the bulkhead, removed and replaced the rotted motor mount stringer o n the starboard side.
we removed the old broken mini fridge, cleaned the interior... came out great.....
the entire bilge has been cleaned several times de-greased and is almost ready for paint.
two motors are sitting in my shop ready to swap out tins, transmissions, etc.....
Left to do:
re wire all grounds
replace stuffing boxes
fix cruiseair
add bilge pump and begin re- wiring, switch replacement.
sand and paint bottom
build teak swim platform
the 28 is coming together
Moderators: CaptPatrick, mike ohlstein, Bruce
- scot
- Senior Member
- Posts: 1470
- Joined: Oct 3rd, '06, 09:47
- Location: Hurricane Alley, Texas
- Contact:
Re: the 28 is coming together
Pictures please :-)
Scot
1969 Bertram 25 "Roly Poly"
she'll float one of these days.. no really it will :-0
1969 Bertram 25 "Roly Poly"
she'll float one of these days.. no really it will :-0
Re: the 28 is coming together
Would love to see the progress via photos. You might want to consider the PSS shaft seals instead of the traditional stuffing boxes. I have had mine 8 years with no maintenance in my B28. I just repowered last year and did many of the items you mentioned. Satisfaction! Best of luck.
Re: the 28 is coming together
Definitely get some pictures if you can. Its always cool to see the build threads. Sounds like your winding it up so its almost time to enjoy all the work.
Who is online
Users browsing this forum: Bing [Bot], Google [Bot] and 182 guests