![]() Underway for N.C. 07:00 11/15/02... Basic box (excluding the grill assembly) ![]() ![]() ![]() Cut in and fit both air boxes, plug old vent holes, Grind &: prep, ready for epoxy installation Grill temporarily installed... ![]() ![]() Final installation & 5200 caulking... Inside details 3/4" plywood reinforcement below boxes being epoxied in.. Bottom sanding and repairs as of 11/03/02 (Darker spots are Steve's epoxy patches. lighter one's are Blake's) 2 coats of Interlux 2000/2001 epoxy barrier coat ![]() 2 coats of Micron CSC BioGuard Running gear gets 2 part clear spray Tempo Anti Fouling paint (One primer coat & 3 Antifouling coats) Ready for launch 11/12/02... Engine box getting new 3/4" stiffeners epoxied in Full perimiter teak moulding beneith engine boxes |