As I have arthritis in my hip and the doctor says no to climbing stairs, I decided to remove my flybridge - the bonus is that an express is a much better fishing platform for salmon and halibut which is what we have here on the west coast of Vancouver Island.
So, after scratching my head for a month, I removed the flybridge, cut it into 11 pieces, and put it back together to act as a windscreen to hide the wiring for my instruments which I mounted on the roof. I also repowered with Mercruiser 5.7 with DTS and Smartcraft guages which allowed me to use electronic controls at the new location instead of having to run cables.
I raised the deck over the engines by 4" to allow room for the engines, and the side benefit of that was much increased visibility from my new station.
I added an Atlantic Towers hardop over my new steering station and will have an enclosure for that area made this winter.
Cliff



